Project Scope

The mine extension at Kestrel mine required a new long travelling, luffing and slewing stacker. The scope of the work also included the installation of stacker rails for machine operation.

Schedule

Completion: 2012

  • Customer: Rio Tinto
  • Plant location: Kestrel QLD, Australia
  • Product: Coal
  • COVA: Design-Project Management & Procurement
  • Haywards: Fabrication & Construction
  • Capacity: 3450 t/hr
  • Belt width: 1600mm
  • Outreach: 28.5m
  • Slewing range: +/- 120 degrees
  • Luffing range: +/- 15 degrees
  • Stockpile width: 40m
  • Travel range: 727m
  • Rail gauge: 6m
  • Schedule: 2012