Project scope
COVA provided project and construction management for the International School of Phnom Penh's purpose-built campus, completed in August 2015 and uniting the elementary and secondary schools on one site for the first time.
Funding required phased construction alongside a live school, so safety, noise and dust were managed to keep teaching running unhindered throughout.
The campus holds 1,000 students on 5.4 hectares, with an Olympic-size pool, indoor sports courts, playing fields, knowledge centre, art gallery and fully equipped laboratories.

Overview
- Market
- Education
- Budget
- $30m USD
- Disciplines
- Project & Construction Management
- GLA (sqm)
- 21,000
- Status
- Complete
- Challenges Overcame
- Funding restraints dictated that a phased construction approach was required to deliver the project. This meant that construction had to run in parallel with a live school for long periods of time bringing many challenges of safety and allowing tuition to proceed unhindered by noise and dust.
- Construction Completion (year)
- 2015
- Student Capacity
- 1,000
- Campus (hectares)
- 5.4