COVA was engaged to review and optimise the mechanical, electrical and hydraulic systems at Pump House Point, focusing on efficiency, sustainability and future-proofing: evaluating heating and cooling strategies, assessing alternative energy solutions, estimating electrical loads, and advising on lighting, solar and backup power, with sustainability practice integrated across all works.