Chris Tummon
Chris Tummon

Project Development Manager - EPC

Project scope

Burnie TAS, Australia

The first of our major shiploader designs dating back to 1995. COVA designed and managed the construction of a woodchip receival and stockpiling system and a reclaim and out loading facility. Chips were received from trucks positioned on elevating tipper units and reclaimed by dozer into pits under the stockpile

AT A GLANCE

Status

Complete

Year

1995

Category

Bulk Materials Handling

Location

TAS, Australia

Overview

Location

TAS, Australia

Market

Bulk Materials Handling

Disciplines

Engineer Procure Construction (EPC)

Construction Completion (year)

1995

Status

Complete

Procurement Methodology

Fully Documented

Capacity

1300 t/hr

Belt Width

1500mm

Max Outreach from Fender

25m

Shuttle travel

14m

Slewing Range

Fixed

Luffing Range

0 to +80 degrees