Project scope

Kestrel QLD, Australia

The mine extension at Kestrel mine required a new long travelling, luffing and slewing stacker. The scope of the work also included the installation of stacker rails for machine operation.

AT A GLANCE

Status

Complete

Year

2012

Category

Bulk Materials Handling

Location

QLD, Australia

Overview

Location

QLD, Australia

Market

Bulk Materials Handling

Disciplines

Engineer Procure Construction (EPC)

Construction Completion (year)

2012

Status

Complete

Client

Rio Tinto

Procurement Methodology

Fully Documented

Other Consultants

Haywards: Fabrication & Construction

Capacity

3450 t/hr

Belt Width

1600mm

Outreach

28.5m

Slewing Range

+/- 120 degrees

Luffing Range

+/- 15 degrees

Stockpile Width

40m