Chris Tummon
Chris Tummon

Project Development Manager - EPC

Project scope

Onslow WA, Australia

A long travelling gull wing stacker specifically designed to stack salt onto 2 stockpiles either side of a central rail and rising tripper conveyor feed system. In doing so, a critical aspect of the design was the chute enabling product to transfer to each of the booms. There was significant involvement with the fabricator to ensure simplicity of road transport as well as assistance with completing a full trial erection off site of a machine that measured almost 100m from boom tip to boom tip.

AT A GLANCE

Status

Complete

Year

1999

Category

Bulk Materials Handling

Location

WA, Australia

Overview

Location

WA, Australia

Market

Bulk Materials Handling

Disciplines

Engineer Procure Construction (EPC)

Construction Completion (year)

1999

Status

Complete

Client

Onslow Salt

Procurement Methodology

Fully Documented

Capacity

1500 t/hr

Belt Width

1200mm

Outreach

46m

Slewing Range

Fixed

Luffing Range

Fixed

Stockpile Width

76m