Project scope

Telfer WA, Australia

3 tower stackers for Telfer Gold mine The three identical stackers included slew, luff and shuttle capability in order to maximise the stockpile size. Significant liaison with other suppliers was required to ensure the support tower and park locations were correctly positioned and designed. Fabrication was carried out in Tasmania necessitating a design that allowed for ease of road transport and subsequent site erection.

AT A GLANCE

Status

Complete

Year

2003

Category

Bulk Materials Handling

Location

WA, Australia

Overview

Location

WA, Australia

Market

Bulk Materials Handling

Disciplines

Engineer Procure Construction (EPC)

Construction Completion (year)

2003

Status

Complete

Client

Newcrest

Procurement Methodology

Fully Documented

Capacity

1400mm

Outreach

33m

Slewing Range

+/- 165 degrees

Luffing Range

-11/+10 degrees

Travel Range

Slew