Project scope

Maules Ck NSW, Australia

Built for the Whitehaven Maules Creek Coal Mine. The design and fabrication was completed by 2012, the stacker was then moved into storage for 2 years before assembly and going into service in 2015. This long travel, luff and slew stacker serves the new Whitehaven mine near Gunnedah NSW. Scope of work included design, supply and site construction.

AT A GLANCE

Status

Complete

Year

2015

Category

Bulk Materials Handling

Location

NSW, Australia

Overview

Location

NSW, Australia

Market

Bulk Materials Handling

Disciplines

Engineer Procure Construction (EPC)

Construction Completion (year)

2015

Status

Complete

Client

Sedgman

Procurement Methodology

Design & Construct

Capacity

1800 t/hr

Belt Width

1200mm

Outreach

43.6m

Slewing Range

=/- 100 degrees

Luffing Range

+15 to -10 degrees

Stockpile Width

60.5m